A change to one building service can sometimes create consequences well beyond that individual system.
Our Latest Blog Posts
Why Mechanical Services Can Be Difficult to Upgrade in Existing Buildings
Upgrading mechanical services in an existing building is rarely as simple as replacing old equipment with something new.
What Should Be Considered Before Modifying Existing Building Services?
Modifying building services is rarely as simple as changing the part of the system directly affected by the project.
Why Hydraulic Services Can Become a Major Challenge in Building Refurbishments
Upgrading an existing building often means working around hydraulic services that were designed for a completely different layout, use or level of demand.
What Makes Fire Services Difficult to Coordinate in Building Fit-Out Projects?
Fire services can appear straightforward on a building services drawing. Coordinating them within an actual fit-out, however, can become far more complex.
Why Stormwater Design Should Be Considered Early in a Building Project
Stormwater is easy to overlook during the early stages of a building project. But once building layout, levels and external spaces are established, changing the drainage strategy can become far more difficult.
What Should Be Checked Before Adding a New Electrical Load to an Existing Building?
Adding new electrical equipment to an existing building is not always as simple as connecting it to the nearest available supply.
Why Integrated MEPF Engineering Is Critical for Low-Carbon Commercial Buildings
Low-carbon commercial buildings are not created simply by selecting energy-efficient equipment.
What Makes Building Services Engineering for Existing Buildings Different from a New Development ?
Designing Building Services Engineering for an existing building is not simply a matter of applying the same approach used for a new development.