Commercial Buildings

What Should Be Considered When Designing EV Charging for Commercial Buildings?

Electric vehicles are becoming an increasingly relevant consideration for commercial buildings, from offices and shopping centres to hotels, apartment developments and mixed-use projects.

However, installing EV chargers is not simply a matter of selecting charging equipment and connecting it to the building’s electrical system. The number and type of chargers, available electrical capacity, parking layout, load management, future demand and electrical infrastructure all need to be considered as part of the building design.

Planning these requirements early can help avoid capacity constraints and costly changes later.

How Much EV Charging Capacity Will the Building Need?

The first consideration is understanding the building’s current and future charging requirements.

A project may initially require only a small number of charging bays, but the electrical infrastructure may need to accommodate additional chargers as EV adoption increases.

The design assessment should consider:

  • Number of proposed charging spaces
  • Expected charging demand
  • Type and power rating of chargers
  • Building occupancy and operating patterns
  • Existing electrical demand
  • Potential future expansion
  • Whether charging will be private, shared or publicly accessible

Planning only for the first installation can result in an electrical system that becomes difficult or expensive to expand.

Australian Government guidance similarly recommends assessing both current and future EV charging needs when preparing buildings for EV charging.

Can the Existing Electrical System Support EV Charging?

EV chargers add electrical load to a building, so the existing electrical infrastructure needs to be assessed before the charging system is selected.

Depending on the project, this may involve reviewing:

  • Incoming electrical supply
  • Existing peak demand
  • Main switchboard capacity
  • Distribution boards
  • Cable capacity
  • Available space for additional equipment
  • Protection systems
  • Voltage drop
  • Existing electrical loads
  • Future electrical demand

An important point is that available capacity cannot be determined simply by looking at the building’s connected load.

Historical demand and how existing equipment operates can help establish how much capacity is actually available for EV charging.

For existing buildings, this assessment can determine whether the site is already EV-ready, can be made EV-capable with modifications, or requires broader electrical upgrades.

What Type of EV Chargers Should Be Used?

Not every commercial building needs the same charging solution.

The appropriate charger depends on factors such as how long vehicles typically remain parked, the required charging speed and the available electrical capacity.

For example:

  • Lower-power charging may suit workplaces where vehicles remain parked for several hours.
  • Higher-power charging may be appropriate where faster turnaround is required.
  • Shared charging infrastructure may be more practical than providing a high-power charger at every parking space.

The goal should be to match charging capacity with the building’s actual operational requirements rather than simply selecting the highest-powered equipment available.

Why Does Load Management Matter?

Multiple EV chargers operating simultaneously can create a substantial additional demand on a building’s electrical system.

Load management can help control this demand by adjusting charging rates according to available electrical capacity and other building loads.

For example, charging demand may need to be managed when the building is already operating significant:

  • HVAC equipment
  • Lifts
  • Commercial kitchen equipment
  • Lighting
  • Data and communications systems
  • Other large electrical loads

A load-management strategy can allow more charging points to operate without requiring every charger to draw its maximum available power at the same time.

Australian Government guidance identifies load management as an important consideration where multiple EV chargers are installed, particularly where available building capacity is limited.

Where Should EV Chargers Be Located?

The location of charging bays needs to work with both the electrical design and the building’s parking arrangement.

Designers may need to consider:

  • Distance between chargers and electrical distribution equipment
  • Cable routes
  • Car park configuration
  • Structural constraints
  • Accessible parking requirements
  • Traffic movement
  • Protection of charging equipment
  • Lighting and signage
  • Future expansion of charging infrastructure

Car parks with long cable routes, multiple levels or difficult access can introduce additional design and installation constraints.

Considering these issues during the planning stage can reduce unnecessary infrastructure changes later.

Should the Building Be Designed for Future EV Charging?

In many projects, it can be useful to consider EV readiness even where the full number of chargers will not be installed immediately.

This may involve planning:

  • Space for future distribution equipment
  • Electrical capacity
  • Cable pathways
  • Distribution infrastructure
  • Future charging bays
  • Load-management capability

This approach can make later expansion more straightforward.

The Australian Government’s guidance for commercial and multi-residential buildings encourages consideration of EV readiness, while WA has introduced requirements relating to EV-ready provisions in new buildings.

How Does EV Charging Affect Other Building Services?

EV charging should not be designed in isolation.

Introducing additional electrical infrastructure can affect the wider building-services design, particularly where projects already have limited electrical capacity or congested service areas.

Coordination may be required between:

  • Electrical distribution
  • Car park layouts
  • Mechanical services
  • Fire services
  • Communications and data systems
  • Solar PV systems
  • Energy monitoring
  • Building management systems

For example, integrating EV charging with solar generation or building energy-management systems may influence how electrical infrastructure is planned.

What About Existing Commercial Buildings?

Retrofitting EV charging into an existing building can be more complicated than incorporating it into a new development.

Existing projects may have limitations involving:

  • Switchboard capacity
  • Existing electrical demand
  • Cable routes
  • Available plant or electrical rooms
  • Car park configuration
  • Structural constraints
  • Existing service congestion
  • Future expansion capacity

A feasibility assessment can identify these constraints before equipment is purchased or installation begins.

This is particularly important where multiple charging points are planned.

EV Charging Design Checklist

Before finalising an EV charging strategy, consider:

✓ What level of EV charging demand is expected now and in the future?

✓ Can the existing electrical supply support the proposed charging infrastructure?

✓ What type and power rating of chargers are appropriate?

✓ Will load management be required?

✓ Where will charging bays and electrical equipment be located?

✓ Are suitable cable routes and distribution infrastructure available?

✓ Has future expansion been considered?

✓ How will EV charging interact with other major building loads?

✓ Are applicable building, electrical and network requirements being addressed?

✓ Who will operate and maintain the charging infrastructure after installation?

Frequently Asked Questions

Does every commercial building need high-power EV chargers?

No. Charger selection should reflect how the building is used, how long vehicles remain parked and the required charging speed. Higher-power charging is not automatically the best solution.

Can existing commercial buildings install EV chargers?

Yes, but the feasibility depends on the existing electrical infrastructure, available capacity, parking arrangement and required charging solution. Existing buildings may require electrical upgrades before chargers can be installed.

Can multiple EV chargers share the building’s available electrical capacity?

Yes. Load-management systems can help distribute available capacity between multiple chargers and other building loads. The appropriate approach depends on the building’s electrical system and charging requirements.

Should future EV charging demand be considered during new building design?

Yes. Planning electrical capacity, distribution infrastructure and pathways for future charging can make later expansion easier and reduce the need for major modifications.

Final Thoughts

EV charging is becoming an increasingly relevant part of commercial building electrical design. The challenge is not simply installing chargers; it is ensuring the building can support them safely, efficiently and as demand develops.

Electrical capacity, charger selection, load management, parking layout, distribution infrastructure and future expansion should therefore be considered together.

For new developments and existing commercial buildings alike, early EV charging planning can help create an electrical system that is capable of supporting current requirements while remaining adaptable to future demand.